Conduit installation

Parallel Conduit Offset Calculator

Calculate staggered first and second bend marks for multiple parallel conduit runs using center spacing and bender factors.

Conduit geometry

Parallel offset details

in
in
in

Calculated marks

Parallel run marks
8.000 in spacing
Run 121.000 / 29.000 in
Run 223.000 / 31.000 in
Run 325.000 / 33.000 in
Geometry aid onlyUse the take-up and bend data for the actual bender, and verify final dimensions with a test bend.

Method and field check

Each run uses the same offset spacing and shrink. The first mark is staggered by the entered center-to-center spacing so the parallel runs can be laid out from a common reference. Confirm orientation, bend angle, and actual bender multipliers before cutting.