Panel analysis

Panel Phase Load Balance Calculator

Compare three panel phase loads with their average and quantify the maximum percentage imbalance.

Commercial load worksheet

Calculation inputs

A
A
A

Calculated result

20.00% imbalance
Average phase load100.00 A
Preliminary worksheetVerify adopted code tables, equipment schedules, phase assignments, and continuous-load definitions before design use.

Method and field check

The displayed imbalance is the largest absolute deviation from the three-phase average. Use measured or scheduled phase loads and verify neutral and harmonic conditions separately.