Commercial estimating

Commercial Material and Labor Estimate

Build a rough commercial electrical material and labor estimate from quantities, user-entered prices, cable waste, hours, and labor rate.

User-entered estimating data

Material and labor inputs

ea
$ / ea
ea
$ / ea
ft
$ / ft
ea
$ / ea
%
h
$ / h
Rough project estimate

Estimated total

$3,643
Materials$923
Labor$2,720
Cable with waste880 ft
Material line items$80 devices · $50 boxes · $748 cable · $45 fittings
Rough estimate onlyPrices, labor rates, quantities, productivity, taxes, freight, permits, overhead, markup, and project-specific materials are user inputs. This worksheet does not provide market pricing or a bid.

About this worksheet

Enter the material quantities, unit prices, cable route, waste allowance, labor hours, and labor rate from your project takeoff. The worksheet returns separate material, labor, and total estimate values.

Method and assumptions

Cable cost uses cable route length multiplied by one plus the waste percentage. Device, box, and fitting costs use their entered quantities and unit prices. Labor cost uses entered hours multiplied by the entered labor rate. The total equals material cost plus labor cost.

All prices, quantities, and labor assumptions remain user-controlled. Add project-specific items such as raceway, supports, terminations, equipment, controls, permits, testing, freight, overhead, and markup separately.

Use the result

Compare the estimate with the plans, supplier quotes, field conditions, production assumptions, and contract scope before using it for internal budgeting. It does not replace a detailed takeoff or bid review.

FAQs

Where do the prices come from?

You enter the material prices and labor rate. The worksheet does not fetch local market pricing, wage data, taxes, freight, or markup.

What does the waste allowance affect?

The waste percentage applies to cable footage only. Device, box, and fitting counts remain the quantities you entered.

Can I use this as a bid?

No. Use it as a rough worksheet after comparing the output with plans, takeoff quantities, supplier quotes, productivity assumptions, project conditions, and contract requirements.